CVM provided comprehensive engineering and building enclosure services to address significant deterioration of the building’s exterior façade. The existing EIFS finish coat was failing, peeling, and detaching, creating safety concerns for the plaza area below, and was therefore carefully repaired and replaced. In addition, areas of cracked and spalled concrete were assessed and restored to ensure the long-term durability and performance of the structure. CVM prepared a full set of construction documents, including detailed drawings, technical details, and written specifications, outlining the replacement of the EIFS system and the associated repairs to the precast concrete. These documents were submitted for owner review and coordination, providing a clear roadmap for construction and quality control. The project improved both the safety and longevity of the building envelope while restoring the façade’s appearance and performance.
Location: Philadelphia, PA
Prime Consultant: CVM