A historically-significant structure constructed in 1899, Harvard University is renovating this colonial revival house as part of its River House renovation program. Faced with significant structural distress as well as a desire to preserve the original structure, CVM developed a strategy that included lifting the house to insert new foundations and reinforcing and strengthening the existing wood structure to address all other deficiencies and support the building’s new program.
Location: Cambridge, MA